BenQ SL 703S Guia do Utilizador Página 16

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 15
Operation
11
Benq Corporation
OPERATION
Start Up
1. Plug the power cord into a wall socket.
2. Press POWER for 1 second.
The back-lit POWER key blinks green and stays green when the power is turned
on.
(When the power is turned off, there is a 60-second cooling period before the
projector can be re-started.)
3. Switch on all connected equipment.
Power
Power
Projector
Remote Control
Vista de página 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 31 32

Comentários a estes Manuais

Sem comentários